Comprehensive Documentation for Losern Alfalfa Farming | Future Reference Guide
Documentation Date: December 2024 | Suitable for Pakistani Agriculture Conditions

Fig 1.1: Proper field preparation ensures good drainage and uniform growth
| Material | Quantity | Timing |
|---|---|---|
| Gypsum | 2 tons/acre | During land preparation |
| Old Compost | 1 ton/acre | During land preparation |
| Sulphur Bentonite | 25 kg/acre | At land preparation (use carefully in heat) |
Glyphosate Spray: 1-2 liters/acre, apply 3 months before sowing to eliminate all green weeds.

Fig 2.1: Recommended alfalfa seed varieties
Contact for Cuf 103: 0331-4311180
Seed Type: Cold-tolerant, old crop seeds preferred
20 October to 15 November when night temperature reaches 18°C
10-15 kg per acre with minimal seed coating
Light irrigation after sowing, then wait 4 days before next watering

Fig 3.1: Fertilizer application techniques
| Material | Quantity per Acre |
|---|---|
| Zarkhaiz Plus | 50 kg |
| NP Fertilizer | 15 kg |
| Urea | 15 kg |
| Sulphur | 4 kg |
| Compost Tea | 40 liters |
Brew Time: 36-48 hours with continuous aeration
Temperature: 20-25°C (optimal for microbial growth)
Sulphur
Urea

Fig 4.1: Alfalfa ready for cutting at 28 days
| Cut | Month | Optimal Age | Condition |
|---|---|---|---|
| First Cut | January | 28 days | Before flowering |
| Second Cut | February | 28 days | 5-10% flowering |
Important: Never let crop age beyond 28 days

Fig 5.1: Armyworm - major pest in alfalfa cultivation
| Season | Weed Type | Recommended Herbicide |
|---|---|---|
| Winter | Broadleaf weeds | Cardinal |
| Summer | Narrowleaf weeds | Excel |
Spray Timing: Preferably during cool hours
048 3712653
director.fodder@gmail.com
Contact local agriculture extension
Specialized in arid region crops
0331-4311180
For seed and sorgaab spray information
Always use double rotavator before sowing for proper seedbed preparation.
Ensure good drainage at all times. Light irrigation with proper runoff.
Follow cutting schedule strictly to maintain optimal protein content.
Monitor for pests 7 days before each cut and take preventive measures.
Sulphur Bentonite Application: Can burn crops in high heat. Apply carefully during cooler periods and mix properly with urea (1 kg sulphur with urea as basal dressing).